Minimal Process Modification for Capture • Class VI / State Well Permitting Ensures No Contamination, No Induced Seismicity • CCS Implementation Requires a Full Project Lifecycle Approach starting ~4 years [email protected]
scaled CO2 electrolyzer cells Using advanced nano-catalyst gas diffusion electrodes Built as mass- produced modules to rapidly deploy At room pressure and temperature to load-follow At lower costs than current fossil fuel path. Shipping product now Building First Commercial Plant in Decatur, IL co-located with bioethanol refinery OCOchem’s Formate Pilot Plant 60 tons per year - Richland, Washington Technology Scaled Out, Proven.