Create Your Successful Agile Project: Drexel 2023

Create Your Successful Agile Project: Drexel 2023

Too many teams start their agile journey with practices. But agile approaches require a culture change. Instead, use principles to create an agile culture. When you use these principles: project rhythm, visualize work and bottlenecks, measures that work for the team, and a culture of continuous improvement, you are well on your way.

Avatar for Johanna Rothman

Johanna Rothman

April 28, 2023
Tweet

More Decks by Johanna Rothman

Other Decks in Business

Transcript

  1. © 2023 Johanna Rothman @johannarothman 4 Principles 1. Create a

    project rhythm 2. Visualize work and the bottlenecks 3. Develop and use measures that reinforce the team’s delivery and improvement 4. Create a culture of continuous improvement with experiments 2 Ideas Responsible Person Ranked Backlog Cross-Functional Team The team produces shippable product on a regular basis Demo Retrospective General Agile Picture
  2. © 2023 Johanna Rothman @johannarothman Principle 1: Create a Project

    Rhythm • Many teams start with Scrum in 2-week iterations 3
  3. © 2023 Johanna Rothman @johannarothman Iterations Work Well When… •

    Everyone understands when the iteration starts and fi nishes: • Enough hours of overlap • The entire team works together on one product • You can right-size features to fi t into an iteration • You don’t need to accommodate too much interrupting work 4
  4. © 2023 Johanna Rothman @johannarothman Which Project Rhythms Might You

    Need? • Finish a story—every day or two. • Kaizen to address a small improvement. • Assess team satisfaction—daily. • Demo—weekly or biweekly. • Re fi ne more stories to prepare for more work—once or twice a week. • Weekly or biweekly retrospective. • Weekly or biweekly planning. • Standups—do you need them?? 5
  5. © 2023 Johanna Rothman @johannarothman Flow With a Cadence Also

    Works • One team always re fi nes stories on Mondays and Thursdays for 20-30 minutes. • They demo every Wednesday at the PO’s 10 am (and record the demo) • They conduct a kaizen when they want to • A more formal retro on Fridays at noon Eastern 6
  6. © 2023 Johanna Rothman @johannarothman Principle 2: Visualize Work and

    Bottlenecks • If we can see the work, we can choose how to manage it • If we can see where the bottlenecks are, we can choose to experiment or change 7
  7. © 2023 Johanna Rothman @johannarothman Map Your Current Work States

    • What states does your team need to fi nish work? Example: code review. • Use those states to de fi ne your board. • This is a value stream map. The work time is the cycle time. 10
  8. © 2023 Johanna Rothman @johannarothman Principle 3: “Virtuous” Metrics •

    Measures that reinforce: • More of what we want and • Less of what we don’t want 11
  9. © 2023 Johanna Rothman @johannarothman Possible (Virtuous) Measures • Team-visible

    measures • Cycle time (and/or lead time) (Want to reduce cycle time) • Cumulative fl ow (Want to reduce/manage WIP in various states) • Share the team’s progress outside the team: • Demos • Features chart • Product backlog burnup chart • Done and not yet released 12
  10. © 2023 Johanna Rothman @johannarothman Never Report Velocity or Story

    Points • Velocity is a measure of capacity, not productivity or acceleration nor speed • Story points are personal to a team • Assume you walk at a normal pace of 4 mph, normal velocity. • How to account for: • Weather • Talk to a neighbor • Detour • Same duration, different fi nishing. 13
  11. © 2023 Johanna Rothman @johannarothman Relative Size Estimates Don’t Include

    Delays • One team: • Estimated this item would be a day or so (1 story point) • People only spent a day or so on it • But, the team took many days or weeks to deliver it • Where did the time go? (Cycle time explains) 14
  12. © 2023 Johanna Rothman @johannarothman Notes About the Value Stream

    Images • Most of the teams I work with have much longer cycle times • Work times of one day or so. Wait times of 4-7 days, for a total of 8 days of cycle time • Count weekends. Your customers don’t stop wanting work just because it’s a weekend 18
  13. © 2023 Johanna Rothman @johannarothman Use Cycle Time to Forecast/Estimate/Predict

    • How long do items “normally” take to fi nish? • When do we have out-of-bounds unexpected cycle times? 20
  14. © 2023 Johanna Rothman @johannarothman Measure Completed Features • Completed

    features (running, tested features) • Your customers use them • You can release them • They are valuable • Include total and remaining features so we have a sense of where we are • Depends on deliverables, not epics or themes 21
  15. © 2023 Johanna Rothman @johannarothman Product Backlog Burnup • Real

    earned value • Partial answer to “Where are we?” • Shows value feature-by-feature • Shows when features grow 22
  16. © 2023 Johanna Rothman @johannarothman What Do You Want Less

    of? • Work In Progress (across entire project or program) • How often can you release internally and externally? • Defects: when they occur and when you detect them? • Other “Less of”: • Multitasking • ? 24
  17. © 2023 Johanna Rothman @johannarothman Principle 4: Continuous Improvement with

    Experiments • Retrospectives • Kaizen • Choose one thing to experiment with every week or two • This is more important than any other meeting you have 25
  18. © 2023 Johanna Rothman @johannarothman Entire Team Re fl ects

    • All the people who create the product re fl ect together • Kaizen: 20-60 minutes to discuss issue, select alternative, create action plan • Retrospective: 60-120 minutes on a regular basis to gather data and decide what to do. (Highly recommend Agile Retrospectives: Making Good Teams Great) 26 Ideas Responsible Person Ranked Backlog Cross-Functional Team The team produces shippable product on a regular basis Demo Retrospective General Agile Picture
  19. © 2023 Johanna Rothman @johannarothman How Can You Use These

    4 Principles Now? 1. Create a project rhythm 2. Visualize work and the bottlenecks 3. Develop and use measures that reinforce the team’s delivery and improvement 4. Create a culture of continuous improvement with experiments 27 Ideas Responsible Person Ranked Backlog Cross-Functional Team The team produces shippable product on a regular basis Demo Retrospective General Agile Picture
  20. © 2023 Johanna Rothman @johannarothman Flow Ef fi ciency Thinking:

    A Helpful Frame • Focus on the work item, not the person doing the work • Resource ef fi ciency focuses on the person • Flow ef fi ciency focuses on the work • Make this the one standup question: “What do we, as a team, need to do move this work to done?” 28 Resource E ffi ciency Flow E ffi ciency